
欢迎关注舒朋士
微信公众账号

Project Name
Shanghai Minxing North Drainage System Early Stormwater Detention Project
Project Scale
12,000 cubic meters
Contract Signing Date
September 12, 2025
As a core pollution control and emission reduction project for the Minxing North Area, this project covers a service area of 3.31 square kilometers. A fully underground early stormwater detention tank with a volume of 12,000 cubic meters will be newly built, together with supporting high-efficiency deodorization system and pipeline reconstruction works. It serves as a benchmark demonstration project for regional water environment improvement.

Project Name
Liyang Southern Area Drainage Pipeline Comprehensive Renovation Project
Project Achievements
Realize full collection of wastewater in sunny weather and light rain conditions, and complete drainage during heavy rainfall. Intelligent management of interception facilities at river outfalls is implemented to practice the concept of "Smart Drainage".

Project Name
Menghe Town Full-area Comprehensive Water Environment Treatment Project, Xinbei District
Project Content
The existing traditional axial-flow pumping station fails to meet current demand due to insufficient designed flow rate. Subject to limited site space, partial renovation and expansion are required. The axial-flow pumping station features a design capacity of 2 m³/s with a barrel diameter of 4.2 m.
