Project Background
Rivers in Daxing District of Beijing fall into two major water systems: the Yongding River and the North Grand Canal. The Yongding River is a national Grade I river. Beizang Town lies alongside the Yongding River and adjacent to the Daxing Biomedical Industry Base of Zhongguancun National Independent Innovation Demonstration Zone.
This project covers the rainwater and sewage diversion and black and odorous water remediation in Beizang Town. It includes the construction of sewage and rainwater systems as well as water environment improvement for 14 villages in the town.
Project Challenges
The project involves numerous scattered villages with small wastewater treatment capacities. Direct discharge of domestic sewage into rivers has caused severe black and odorous water pollution.
Supumps Solutions
Taking full account of local terrain, meteorological and geological conditions, as well as connection requirements with existing roads and pipelines, Supumps designed and supplied 16 sets of small-scale integrated prefabricated pump stations. Supported by our intelligent cloud remote monitoring and operation & maintenance platform, multiple pump stations can be managed remotely, effectively cutting labor costs.
Application Category: Sewage Pump Station