Application field
  • Shanghai Minxing North Drainage System Early Stormwater Detention Project

    Project Name

    Shanghai Minxing North Drainage System Early Stormwater Detention Project

    Project Scale

    12,000 cubic meters

    Contract Signing Date

    September 12, 2025

    As a core pollution control and emission reduction project for the Minxing North Area, this project covers a service area of 3.31 square kilometers. A fully underground early stormwater detention tank with a volume of 12,000 cubic meters will be newly built, together with supporting high-efficiency deodorization system and pipeline reconstruction works. It serves as a benchmark demonstration project for regional water environment improvement.

  • Liyang Southern Area Drainage Pipeline Comprehensive Renovation Project

    Project Name

    Liyang Southern Area Drainage Pipeline Comprehensive Renovation Project

    Project Achievements

    Realize full collection of wastewater in sunny weather and light rain conditions, and complete drainage during heavy rainfall. Intelligent management of interception facilities at river outfalls is implemented to practice the concept of "Smart Drainage".

  • Menghe Town Full-area Comprehensive Water Environment Treatment Project, Xinbei District

    Project Name

    Menghe Town Full-area Comprehensive Water Environment Treatment Project, Xinbei District

    Project Content

    The existing traditional axial-flow pumping station fails to meet current demand due to insufficient designed flow rate. Subject to limited site space, partial renovation and expansion are required. The axial-flow pumping station features a design capacity of 2 m³/s with a barrel diameter of 4.2 m.

Becoming a leading system solution provider in the water industry