
欢迎关注舒朋士
微信公众账号

Project Name
Menghe Town Full-area Comprehensive Water Environment Treatment Project, Xinbei District
Project Content
The existing traditional axial-flow pumping station fails to meet current demand due to insufficient designed flow rate. Subject to limited site space, partial renovation and expansion are required. The axial-flow pumping station features a design capacity of 2 m³/s with a barrel diameter of 4.2 m.
