• Water Environment Improvement Project of Huoniu Area, Beijing Municipal Administrative Center
    Project Background
    Water environment improvement in Tongzhou District covers six major areas: Huoniu, Taima, Yuyong, Chengbei, Lianghe and Hexi. Within the Huoniu Area, there are 11 black and odorous rivers divided into 15 sections, with a total length of 57.29 km, accounting for 21.5% of the total length of black and odorous water bodies in Tongzhou District.
    Project Challenges
    Direct discharge of rural sewage has caused severe river pollution. In addition, the dense river network in Tongzhou brings difficulties to pipeline network construction.
    Supumps Solutions
    Supumps provided 8 sets of integrated prefabricated sewage pump stations for the Huoniu Area. These facilities realize centralized and efficient collection of domestic sewage and greatly reduce direct sewage discharge.
    Application Category: Sewage Pump Station

  • Comprehensive Treatment, Operation and Maintenance Project of Water System in East Jin'an, Fuzhou
    Project Background
    Fuzhou urban area is crisscrossed by watercourses, including over 30 inland rivers such as Jin'an River, Baima River, Guangming Port and Antai River. Most parts of East Jin'an belong to urban-rural fringe areas with uneven coverage of sewage pipe networks.
    Project Challenges
    Severe misconnection exists between rainwater and sewage pipelines in the water system of East Jin'an, resulting in heavy pollution of most inland rivers, which makes renovation imperative. Restricted by limited available land in the old urban area, the equipment is required to occupy minimal space.
    Supumps Solutions
    Supumps delivered 7 sets of integrated prefabricated sewage pump stations for the water system of East Jin'an. The equipment effectively saves land occupation with a total daily treatment capacity of 111,528 cubic meters. It strongly supports the improvement of inland river systems and the restoration of the original beautiful scenery of Fuzhou's waterways.
    Application Category: Sewage Pump Station

  • lack and Odorous Water Remediation Project of North-South Second Canal, Quanzhou, Fujian
    Project Background
    The North-South Second Canal near Jiangnan Yayuan in Licheng District is surrounded by residential quarters, factories and Licheng No.3 Central Primary School. Despite being close to green spaces, unpleasant odors pervade the area. The canal features black water with floating debris, emitting a foul stench and attracting swarms of mosquitoes especially in summer.
    Project Challenges
    The canal shares the same water level with the connected Nandi Canal, leaving almost no water head difference. Consequently, water cannot flow downstream, resulting in persistent black and odorous water.
    Supumps Solutions
    To address the above problems, one integrated sewage pump station was installed. It has a designed capacity of 250 m³/h, with a diameter of 3 meters and a height of 6.2 meters.
    Application Category: Sewage Pump Station

  • 共5条,总2页
  • 1
  • 2
  • »
Becoming a leading system solution provider in the water industry